qq头像女部位胸前高清,欧洲无人区天空码头IV在哪,亚洲中文字幕aⅴ天堂自拍,白洁少妇无删全文免费下载,化橘红的功效和作用

Kengbo Machinery and Nanjing Yaohang Construction Engineering Co., Ltd. re-engaged to create brillia

Grab the grab with the full-turn rig
Nanjing Yaohang Construction Engineering Co., Ltd. used 2 sets of shielded heavy-duty full-sleeve full-rotary drilling rigs (DTR2605H, DTR2005H) for construction, using a grab grab to match the soil for construction, the pile diameter is 1.5m, the pile depth is 85m, and the backfill is floated. The stone boulder formation, and finally into the middle weathered rock 19-20m, is one of the cast-in-place piles with complicated geological environment and difficult construction.

Grab the soil
 
Nanjing Yaohang Construction Engineering Co., Ltd. uses Kengbo Chong grab to take soil for construction, and the diameter of the boulder stone reaches 50-80mm.

Rotary drilling rig
 
Nanjing Yaohang Construction Engineering Co., Ltd. uses a rotary drilling rig to cooperate with the shielded heavy-duty full-sleeve full-rotation drill (DTR2605H), and finally enters the medium-weathered rock of 19-20m. The geological predicament is complex and the construction is difficult.

Rotary drilling rig
Nanjing Yaohang Construction Engineering Co., Ltd. uses a rotary drilling rig to cooperate with Dunan Heavy Industry full casing full-rotation drill (DTR2005H), and finally enters the middle weathered rock 11-12m. The geological predicament is complex and the construction is difficult.
 
Perfusion, hole formation, transfer positioning
Nanjing Yaohang Construction Engineering Co., Ltd. casts the pile into the hole and moves the machine.